Galtier Plaza

Projects > Skyways > Buildings

Galtier Plaza

Connected Skyways
Bridge 19 (North) – 1985
Bridge 23 (West) – 1985
Bridge 26 (South) – 1990

Skyway Adjacent Buildings
Mears Park Place (North)
375 Jackson (West)
Great Northern (180 E. 5th) (South)
333 On The Park (South)

380 Jackson St, St. Paul, MN, 55101
Built: 1986
Floors: 46
Total Sq.Ft: 219,313 (former commercial area)
Parking: 829
Housing Units: 486 (2019)
Owner: Bigos
Security Company:
Security Contact:

Full Skyway Map

Easement Agreements

Skyway 19 Agreement (PDF)
Skyway 19 Agreement – Restated Grant of Easement 2009 (PDF)
Skyway 23 Agreement (PDF)
Skyway 26 Agreement (PDF)

Galtier Plaza Skyway Level (Bridge 19 doc)
Galtier Plaza Street Level (Bridge 19 doc)
Galtier Plaza Skyway Level (Bridge 19 doc)
Galtier Plaza Skyway Level NE Detail (Bridge 19 Restated doc)
Galtier Plaza Skyway Level NE Detail (Bridge 19 Restated doc)
Galtier Plaza Street Level (Bridge 19 Restated doc)
Galtier Plaza Skyway Level (Bridge 19 Restated doc)
Galtier Plaza Street Level (Bridge 23 doc)
Galtier Plaza Skyway Level (Bridge 23 doc)
Galtier Plaza 3rd Level (Bridge 23 doc)

Questions

The Bridge 23 images are also in the Bridge 26 doc. Does the absence of the 3rd level easement in the 2009 Restatement mean it no longer exists or are the earlier easements still in effect for the 3rd level?


Bridges

A comprehensive guide to the climate controlled city owned bridges that make the skyway the skyway. 

Buildings

Essentially the same information presented in the bridges section, only sorted by building.

Access
FUTURE SECTION

Why is this door locked? Where ARE the doors? How do I get in? How do I get OUT? Skyway access is one of the more perplexing aspects of the DtStP Skyway.

Wayfinding
FUTURE SECTION

Getting from A to B can be quite an undertaking. There are maps and signs in every building but how helpful are they and what does improving them mean?


Immediate Action Items:

Bridges:

  • Determine what content is most valuable
  • Go through agreements and add any additional buildings included
  • Get consistent photos for all skyway bridges
  • Compile information in a spreadsheet/database

Long-Term Action Items:

  • Redraw easements to modern technology standards (or submit a request that DSI do it?)
  • Obtain hi-res skway level building maps and integrate with bridges and access maps, creating a SUPERmap.
  • Add a comprehensive buildings section to the mix, including all spaces vacant and occupied.
  • Integrate database with comprehensive DtStP database.

Potential Related Projects?

DtStP Database

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s