Securian 401

Projects > Skyways > Buildings

Securian 401

Connected Skyways
Bridge 9 (North) – 1978
Bridge 11 (West) – 1980
Bridge 12 (East) – 1981
Bridge 18 (South) – 1974

Skyway Adjacent Buildings
Golden Rule (North)
Town Square (West)
Securian 400 (East)
US Bank Center (South)

401 N Robert St, St. Paul, MN, 55101
Built: 1998
Floors: 13
Total Sq.Ft: 572,172
Parking: 910
Owner: Securian
Management Company:
Security Company:
Security Contact:

Full Skyway Map

Easement Agreements

Skyway 9 Agreement (PDF)
Skyway 11 1 of 2 (PDF)
Skyway 11 2 of 2 (PDF)
Skyway 12 1 of 2 (PDF)
Skyway 12 2 of 2 (PDF)
Skyway 18 Agreement (PDF)

I believe these are for buildings that were replaced by Securian 401 bldg. (Bridge 9 doc)
I believe these are for a building that was replaced by Securian 401 bldg. (Bridge 9 doc)
I believe these are for a building that was replaced by Securian 401 bldg. (Bridge 9 doc)
I believe these are for a building that was replaced by Securian 401 bldg. (Bridge 9 doc)
I believe these are for a building that was replaced by Securian 401 bldg. (Bridge 9 doc)
“Securian 401” to Town Square Skyway (Bridge 11 doc)
“Securian 401” first floor stairway easement (Bridge 11 doc)
I believe these are for a building that was replaced by Securian 401 bldg. (Bridge 9 doc)

Questions

Is there an updated easement agreement for current Securian 401 layout?


Bridges

A comprehensive guide to the climate controlled city owned bridges that make the skyway the skyway. 

Buildings

Essentially the same information presented in the bridges section, only sorted by building.

Access
FUTURE SECTION

Why is this door locked? Where ARE the doors? How do I get in? How do I get OUT? Skyway access is one of the more perplexing aspects of the DtStP Skyway.

Wayfinding
FUTURE SECTION

Getting from A to B can be quite an undertaking. There are maps and signs in every building but how helpful are they and what does improving them mean?


Immediate Action Items:

Bridges:

  • Determine what content is most valuable
  • Go through agreements and add any additional buildings included
  • Get consistent photos for all skyway bridges
  • Compile information in a spreadsheet/database

Long-Term Action Items:

  • Redraw easements to modern technology standards (or submit a request that DSI do it?)
  • Obtain hi-res skway level building maps and integrate with bridges and access maps, creating a SUPERmap.
  • Add a comprehensive buildings section to the mix, including all spaces vacant and occupied.
  • Integrate database with comprehensive DtStP database.

Potential Related Projects?

DtStP Database

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s