Wells Fargo Place

Projects > Skyways > Buildings

Wells Fargo Place

Connected Skyways
Bridge 3 (North) – 1981
Bridge 6 (West) – 1994
Bridge 7 (East) – 1984

Skyway Adjacent Buildings
World Trade Center Ramp (North)
MN Children’s Museum (West)
Town Square (East)
Treasure Island Center (South)

30 E 7th St, St. Paul, MN, 55101
Built: 1987
Floors: 37
Total Sq.Ft: 634,895
Parking: 158
Owner: Cushman-Wakefield
Management Company:
Security Company:
Security Contact:

Full Skyway Map

Easement Agreements

Skyway 3 Agreement (PDF)
Skyway 6 Agreement (PDF)
Skyway 7 Agreement (PDF)

Wells Fargo Cedar Street Level (Bridge 3 doc)
Wells Fargo Wabasha Street Level (Bridge 3 doc)
Wells Fargo 3rd Level (Bridge 3 doc)
Wells Fargo Easement Notes (Bridge 3 doc)
Wells Fargo and Children’s Museum Easement
(Bridge 6 doc)
Wells Fargo 3rd Level (Bridge 7 doc)
Wells Fargo Cedar Street Level (Bridge 7 doc)
Wells Fargo Wabasha Street Level
(Bridge 7 doc)
Wells Fargo to Treasure Island Connection (Bridge 7 doc)
Wells Fargo to Treasure Island Connection (Bridge 7 doc)
Wells Fargo to Treasure Island “Closure”
(Bridge 7 doc)
Treasure Island Cedar Street Level (Bridge 7 doc)
Bridge & Escalator Easement (Bridge 7 doc)
Treasure Island Cedar Street Escalator
(Bridge 7 doc)

Bridges

A comprehensive guide to the climate controlled city owned bridges that make the skyway the skyway. 

Buildings

Essentially the same information presented in the bridges section, only sorted by building.

Access
FUTURE SECTION

Why is this door locked? Where ARE the doors? How do I get in? How do I get OUT? Skyway access is one of the more perplexing aspects of the DtStP Skyway.

Wayfinding
FUTURE SECTION

Getting from A to B can be quite an undertaking. There are maps and signs in every building but how helpful are they and what does improving them mean?


Immediate Action Items:

Bridges:

  • Determine what content is most valuable
  • Go through agreements and add any additional buildings included
  • Get consistent photos for all skyway bridges
  • Compile information in a spreadsheet/database

Long-Term Action Items:

  • Redraw easements to modern technology standards (or submit a request that DSI do it?)
  • Obtain hi-res skway level building maps and integrate with bridges and access maps, creating a SUPERmap.
  • Add a comprehensive buildings section to the mix, including all spaces vacant and occupied.
  • Integrate database with comprehensive DtStP database.

Potential Related Projects?

DtStP Database

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s